In Progress

FeedMore WNY

Buffalo Construction Consultants, Inc. (BCC) was selected by FeedMore WNY as the Owner's Representative for this estimated $100 million project on a 74-acre site Hamburg, New York. Due to the rapid increase of food insecurity among Western New York residents, current...

read more

Renovate Alfred Pioneer Center

The 31,611 GSF Pioneer Center, originally built in 1958, is undergoing a full renovation to become a modern, student-centered facility. Upgrades include a new dining area, commercial kitchen, wellness spaces, and full MEP system replacements. Construction begins Fall 2025.

read more
Greenpac Mill

Greenpac Mill

Phase I

The first phase of the project focused on excavation and the relocation of existing utilities to accommodate the installation of concrete foundations for three new structures: the Biogas Building, the Motor Control Center (MCC), and the Dissolved Air Flotation (DAF) Building. These new facilities are strategically located between two operational factories — Greenpac and Cascades — requiring precise coordination to avoid disruption to ongoing operations.

read more
Sumitomo Rubber USA Decommissioning Project

Sumitomo Rubber USA Decommissioning Project

The Sumitomo Decommissioning Project involved a detailed and highly coordinated effort to safely remove and prepare specialized manufacturing equipment for transport. The scope of work included the disconnection of all utilities — including electrical, pneumatic, and hydraulic systems — serving 54 PCR (Passenger Car Radial) tire press machines.

read more
Chase Commons

Chase Commons

The former Presbyterian Home, located on High Street in Lockport, served the community as an assisted living facility from its opening in 1959 until its closure. Through an extensive rehabilitation effort, the existing buildings were repurposed into 50 modern apartment units, while preserving key architectural elements that reflect the property’s original character. The redevelopment delivered approximately 40,000 square feet of finished residential space now available for lease.

read more
Shea’s 710 Theatre

Shea’s 710 Theatre

This fast-tracked project will enhance accessibility, expand performance opportunities, and elevate the visitor experience—marking the first of several planned investments across the Shea’s campus and Buffalo Theatre District as Shea’s Buffalo Theatre celebrates its 100th anniversary.

read more
Shea’s Performing Arts Center

Shea’s Performing Arts Center

Buffalo Construction Consultants (BCC) was selected at the construction manager in spring 2024 for the Strategic Expansion & Accessibility Project at the historic Shea’s Performing Arts Center in downtown Buffalo, NY at 439 Pearl Street.

read more
Lackawanna City School District

Lackawanna City School District

2023 Capital Improvement Project: The proposed project will enhance facilities across multiple district schools, including:
High School/Middle School
McKinley Intermediate School
Martin Road Elementary School
Truman School
Building Systems and Mechanical Upgrades

read more
Silver Creek Central School District

Silver Creek Central School District

BCC was awarded the Construction Management Services contract for Silver Creek CSD in June 2024. Over the following months, we worked closely with the District and their design team to finalize plans and successfully secure approval for the largest Capital Improvement Project in the District’s history in December 2024.

read more
Williamsville Central School District

Williamsville Central School District

An emergency structural repair project was executed to address critical stability issues within the building. The scope of work included hydraulically jacking the structure to restore its original floor elevation and repairing approximately 170 structural steel columns.

read more
North Tonawanda City School District

North Tonawanda City School District

In 2024, Buffalo Construction was proud to partner with the North Tonawanda City School District and their design team to successfully pass a $40 million capital project referendum in May.

read more
The Niagara Arts and Cultural Center

The Niagara Arts and Cultural Center

This project aims to restore the Grand Theatre at the Niagara Arts & Cultural Center (NACC), along with supporting facilities such as bathrooms, HVAC systems, sprinklers, and the first-floor entrance.

read more
Village of Kenmore Police Department

Village of Kenmore Police Department

This project entails constructing a state-of-the-art police station to replace the outdated 70-year-old facility. The new two-story, 18,000 sq. ft. building, complete with a fully equipped basement, is designed to meet the demands of modern law enforcement.

read more
SUNY Geneseo: Sturges and Fraser Hall Renovations

SUNY Geneseo: Sturges and Fraser Hall Renovations

The Sturges Hall renovation transformed this historic 1938 building into a modern, 43,000-square-foot space supporting academic and student services.
The Fraser Hall renovation will provide four classrooms, a Prayer, Meditation, and Reflection Room, the Hillel center, and the LGBTQ+ Resource Center on the first floor, along with a vibrant lobby, café, lounge, and conference rooms.

read more
SUNY Binghamton Lecture Hall Building

SUNY Binghamton Lecture Hall Building

The new building will serve as a dynamic hub for students, offering diverse learning spaces and an Information Commons for studying and collaboration. It will accommodate current and future demand for large classes and provide more scheduling flexibility for both faculty and students.

read more
Lyndonville Central School District

Lyndonville Central School District

The project brings a range of significant upgrades to the district, enhancing both athletic facilities and school buildings. A new synthetic track will surround a natural grass regulation soccer field, with improved drainage to keep the site in top condition. This upgrade allows the school to host home track meets for the first time in over a decade while also providing a valuable recreational space for the community.

read more
Canalside Gateway Building

Canalside Gateway Building

Buffalo Construction Consultants (BCC) was selected by the Erie Canal Harbor Development Corporation to serve as the construction manager for the new Canalside Gateway Building. With an approximate 3,000 square perimeter footprint, the Gateway Building will be a four-story structure that includes a level along the canal towpath in downtown Buffalo, NY.

read more
East Aurora Union Free School District

East Aurora Union Free School District

In 2017, Buffalo Construction Consultants (BCC) was hired to manage East Aurora Union Free School District’s most recent district-wide capital improvements project. The project scope encompassed work at Parkdale Elementary, East Aurora Middle School and High School, and District Offices.

read more
Fredonia Central School District

Fredonia Central School District

-2024 Phase 1 will include a roof replacement and a new accessible playground at Wheelock Elementary, along with track resurfacing at the main campus in 2026. Phase 2, starting in Spring 2027 and continuing through Summer 2028, will focus on major mechanical, electrical, and plumbing infrastructure upgrades at the main campus, as well as additional roof replacements.

read more
Depew Union Free School District

Depew Union Free School District

2021 Depew Union Free School District Capital Improvement Project encompassed significant upgrades across four district facilities: Depew High School, Depew Middle School, Cayuga Heights Elementary, and the Bus Garage.

read more
Attica Central School District

Attica Central School District

This project includes a very diverse scope of work spread out over both campuses of the district. At the high school and middle school, there are roof replacements, a wing gut renovation to accommodate the new district offices, cafeteria renovations, HVAC and electrical upgrades and a new addition for the agriculture program.

read more

Lewiston-Porter Central School District

-2024 Project: This important project provides significant replacements of existing HVAC systems and equipment throughout the school district. At the intermediate education center (elementary school) and middle school, brand new heating and cooling systems are being installed and at the high school, the gymnasium and locker rooms are receiving new air conditioning systems. In all, HVAC upgrades include new boilers, new air handling units, new chillers, new unit ventilators and new rooftop units.

read more
Niagara Falls City School District

Niagara Falls City School District

The 2019 Capital Improvement Project at Niagara Falls City School District was comprised of significant work at nine (9) of the district facilities: Abate Elementary, Cataract Elementary, Maple Elementary, Mann Elementary, 79th Street Elementary, Hyde Park Elementary, Gaskill Prep Preparatory, LaSalle Preparatory, and Niagara Falls High School.

read more
Cheektowaga Central School District

Cheektowaga Central School District

Breaking ground in October 2020, this $17 million project consisted of a 30,000 sq. ft. addition on the south side of the existing building of the Union East Elementary School.

read more
Maryvale Union Free School District

Maryvale Union Free School District

2018 Capital Improvement Project. The Maryvale Union Free School District embarked on a comprehensive initiative to enhance learning environments and improve infrastructure across three key facilities: the Primary School, the Middle/Intermediate School, and the High School.

read more
Lancaster Central School District

Lancaster Central School District

For over a decade, Buffalo Construction Consultants (BCC) has partnered with Lancaster Central School District (LCSD) to enhance eleven school buildings and their campuses—all while ensuring uninterrupted school operations.

read more
add_customGalleryBlock: func called.