Manufacturing & Industrial
Our approach to delivering complex manufacturing projects is to place an emphasis on the pre-design and planning phase to ensure that schedules and budgets are developed and managed from the outset with comprehensive consideration. We ensure quality, safety and speed to market for our clients. We often employ a phased and fast track methodology to ensure that projects are completed in conjunction with the business goals of our clients.
Greenpac Mill
Phase I
The first phase of the project focused on excavation and the relocation of existing utilities to accommodate the installation of concrete foundations for three new structures: the Biogas Building, the Motor Control Center (MCC), and the Dissolved Air Flotation (DAF) Building. These new facilities are strategically located between two operational factories — Greenpac and Cascades — requiring precise coordination to avoid disruption to ongoing operations.
Sumitomo Rubber USA Decommissioning Project
The Sumitomo Decommissioning Project involved a detailed and highly coordinated effort to safely remove and prepare specialized manufacturing equipment for transport. The scope of work included the disconnection of all utilities — including electrical, pneumatic, and hydraulic systems — serving 54 PCR (Passenger Car Radial) tire press machines.
24 MW Data Center Build-Out
Buffalo Construction Consultants was selected as the Construction Manager on this expansive Data Center Build-Out project located in Buffalo, New York.
Advanced Aircraft Industrial Manufacturing WNY
BCC is providing design-build services for a brand new 150,000 square foot Advanced Aircraft manufacturing facility project in Elma, NY.
Sumitomo Rubber USA—Mixer 10 & 13
Sumitomo Rubber USA—AB West Curing Row
BCC provided design-build services for a new curing press trench and manufacturing space at the Sumitomo Rubber USA tire manufacturing campus in Tonawanda, NY. The curing press trench is located in the middle of the existing factory floor and is providing twenty-five...
Sumitomo Rubber USA—Tire Building Expansion
BCC has been selected as the Design-Builder for this 55,000 sq. ft. manufacturing expansion. The project will house eight (8) new tire building machines, doubling the local production capacity by 5,000 tires a day. This multi-phase project began in December 2021.
Advanced Space & Defense Manufacturing WNY
BCC is provided construction management services for the construction of a propellant storage addition at the testing facility on a campus in Niagara Falls, NY.